We will offer greatest solutions and high quality products with all sincerity. Hangzhou EPG Co.,Ltd. , was launched in November, 1997. With its 5 wholly owned subsidiaries. EPG has established up a total set of top quality management system which is provided with sophisticated inspection and test products.

More than head crane technological introduction

1 Style stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds
EPTT design stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds are point out stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and relevant stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and needs from person.
1.1 EPTT layout, construction and inspection and test stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds are as follows.
GB3811-eighty three………… lift equipment style stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB/T14405-ninety three…… EPTT above head crane stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB/T14407………… EPTT overhead crane and gantry crane operator cabin stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB6067-eighty five………… lift gear security design and style stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB10183-88………. more than head crane and gantry crane building and
rail installation tolerance
GB12602-ninety………. lift gear overload protective unit stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB5905-86………… crane test stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB8918……………… steel rope stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB5972-86………… carry equipment metal rope inspection and desert stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB7592-87………… EPTT over head crane dimension stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB8923-88………… metal surface rusty quality and rust deleting quality before painting remedy
SDZ 014……………. EPTT portray stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
GB9286-88………… coloured paint and paint film scenario inscription test
GB1497-eighty five………… lower voltage electrical equipment stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
JB/DQ4658-91…… crane resistor established stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
JB/DQ6146-86…… crane manage desk
JB/ZQ2007-90…… crane electrical circuit drawing stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
Q/DQ109-ninety two………. crane electric powered gadgets technological stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
JBZ299-78…………. EPTs and undertaking lift equipments paint shade and protection symptoms
GB/T13384………… EPTT EPT and mechanical merchandise deal
technical stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd

ASEM and so on equivalent stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd can also be adopted for design, manufacture and testing.

1.2 EPTT specification

No. specification quantity note
1 QD20t-15m M5 1 set

two EPTnical define
Our organization is a EPTT crane maker. Developing work is completed by engineering office. EPTT pc aided layout stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds are dependent on consumer technical parameters and use setting circumstances. EPTT stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd is GB/T14405.
three More than head crane technical introduction
three.1 Metal composition
three.one.1 Bridge structure incEPTT primary girEPTTand conclude beam. Major girEPTTis center rail box girEPTTwith static rigidity considerably less than s/800 inside of course A4 and class A6 and static rigidity less than s/a thousand for course A7. Full loaded self-vibration frequency is no considerably less than 2Hz.Out aspect of girEPTThas walkway and guard rails. EPTT vacation devices and girEPTTelectric equipment are set on walkway. EPTT arrangement and profile is reasonable and stunning.
three.1.two End beam is box girEPTTwhich is bolted with large energy bolts.
3.two EPTT mechanisms
three.2.one In hoist system,there are electrical motors, brakes, couplings and EPTT shafts, EPTTs and winding drum, steel wire and hook set, and stationary pulley.
A. Winding drum is created of solid metal or rolled metal plate and steel wire flat angle is no much more than 3.5 deg. There are at lEPT two rounds of basic safety steel wire. Push pads and bolts are steady and reliable.
B. EPT system has severe situation restrict with rotary switch.
C. EPT mechanism has CLZ EPT couplings crane and trolley travel system is CL and CLZ kind.
3.two.2 Trolley travel mechanism
Trolley is separate driving variety. Wheel is double rim variety and bumper is EPT sort.
three.two.3 EPTT travel mechanism
EPTT is four-EPT sort, and wheel has double rims .EPTT shell is angle condition. Bumper is EPT anti-crash type.
three.three Essential parts
3.three.1 Electrical motor is YZP collection with rated volt of 380 v and 50Hz, insulation diploma is F quality and protective grade is IP44.This variety of motor has larger in excess of load capacity and mechanical power and is ideal to equipments which commence and quit frequently or with over load and clear vibration and crash.
three.three.two Brake is YWZ collection with EPT typical shut thruster, raise mechanism has manual release system. Brake has continuous attributes, EPTTer use existence and simplicity of servicing essential in GB6333-86.
three.three.3 EPTT has ZQ sort and ZSC kind required in ZBJ19571.
three.3.4 EPTT hook is solid material needed by GB699-65 and GB1051.
3.three.five EPT content is EPTT150 forged necessary by ZBJ80006-87 and ratio of pulley and steel wire is no less than 22.4.
3.3.six Winding drum is EPTT200 forged required by ZBJ80007-87
three.three.7 Metal wire of 6w(19) sort is essential by GB1102-74 with strength inside of 1400~1700N/mm2.Security factor from 5 to 7 need to be used in accordance to system course.
3.three.8 Wheels set stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd is GB4628-eighty four and wheel substance isZG50SiMn.Tread hardness is in HB300 and HB 380 and more than HB260 in depth of 20mm.
3.three.nine EPT of brake wheel in raise system is #forty five steel at lEPT in GB699.Brake wheel surface hardness is within EPTC45 and EPTC 5 five,and EPTC40 in depth of 2mm.
3.3.10 EPT of key components such as major girEPTTand end beam and trolley frame fulfill stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds of GB700-88 and GB1591-88 as follows.

Components EPTificant parts Other components
Operate ambient temperature Above -20 ordmC Over -twenty~twenty five ordmC Earlier mentioned -twenty five ordmC
Function class A1-A5 A6-A7 A1-A7 A1-A7
EPT
variety
delta le20mm Q235-BF Q235-B Q235-D Q235-AF
delta ge20mm Q235-B Q235-C 16Mn

four EPTT primary craftsmanship
4.1 Raw materials with high quality certificates is checked prior to coming into factory warehouse. Then random chemical-bodily check need to be carried out just before storage in warehouse.
4.2 Steel plate and EPT steel should be shot blasted to achieve grade Sa2.5 for steel plate area and grade S3 for EPT metal. Rust need to be taken out by making use of primer paint.
four.three Refer to far more thorough data for major parts (primary girEPTTand finish beam) process artwork
A. EPTT plate and world wide web plate butt weld must be submerged arc welding. Metal plate a lot more than 10mm thick should be groove welding and weld ought to be ultra-sonic or x-ray non-defects 100% inspected.
B. EPTT plate and world wide web plate cutting is with numerical managed minimize EPTT to acquire pre-deflection.
C. EPTTitudinal seam of major girEPTTand end beam is welded with submerged arc welEPTTor micro-controlled protective carbon dioXiHu (West EPT) Dis.de EPT.
D. EPT and assembly of bridge framework are carried out with massive dimensions system and level welding.
five Useful functions
five.one EPTT static rigidity: for class A4-A6 crane with trolley and load in girEPTTmiddle position, rigidity is considerably less than s/800,for course A7 crane with trolley and load in girEPTTmiddle position, rigidity is less than s/1000.
Static check: crane is loaded with 1.25Gn and 100mm-200mm above floor for a lot more than ten minutes. After load is introduced, main girEPTTshould have no permanent deformation in three check cycles.
five.2 EPTT exams: trolley is loaded with 1.1 Gn to begin and brake in journey distance of each and every action for at lEPT 1 hour. Then, there need to be no harm and linkage free in all components and mechanism.
6 Protecting features
6.one In EPTT distribution protecting program, there are main circuit breaker, major contactor and computerized change in each system. Distribution control has crane EPTT activation and off swap and crisis swap, EPTT source index, protection swap and restrict change. Principal loop has circuit shortening, in excess of load security, volt decline protection and zero protection.
6.2 Restrict swap of LX10-31 shall reduce off EPTT source in hoist mechanism when hook approaches intense point.
six.three There are journey restrict switches at ends of travel mechanisms.
6.4 There are also QCX-2 type overload limiter which has sign and acoustic-optic alarm and above load controls.
7 Basic safety defense
seven.one Crisis switches in control loop circuit shall lower off loop EPTT provide in scenario of emergency.
7.two EPTT entrance doorway and inclining stair door and fence door are all interlocked and have protection switches. When one door is open, security swap is off and then major contactor shall be disconnected instantly.
8 Trolley EPTT supply
Trolley EPTT is provided via suspending delicate cable unEPTTEPT metal.
nine Illumination and signal
9.1 There are separated transformer for signal and illumination. EPT input line volt is 380 V and aux. output line volts are 220V and 36V. 220V is for crane illumination EPTT and 36V is for crane sign and mend EPTT.
9.2 EPTs unEPTTgirEPTTare quake resistant 400w variety.
9.three EPTT have start warning system controlled from operator cabin.
9.four EPTT have repair and check socket of AC 36V.
ten Other folks
10.one EPTTs are organized in raceway, and gentle tube is utilized in which raceway is impossible to achieve.
10.two EPTTs are high temperature evidence and EPT is far more than one.5mmtwo.
ten.three EPTT reception panel and management panel lines of diverse mechanisms use copper wire and copper bars.
10.4 There is 10%~15% inventory allowance in management panel cable bus and EPTT distribution panel and wiring box terminal.
10.5 Main loop contactor in management panels of distinct mechanisms are equally EPTly and mechanically interlocked.

  in San Francisco United States  sales   price   shop   near me   near me shop   factory   supplier 20ton Lifting Capacity 15m Span Double Girder Overhead Bridge Crane manufacturer   best   Cost   Custom   Cheap   wholesaler

  in San Francisco United States  sales   price   shop   near me   near me shop   factory   supplier 20ton Lifting Capacity 15m Span Double Girder Overhead Bridge Crane manufacturer   best   Cost   Custom   Cheap   wholesaler